4-on-4-off schedule calculator
A 4-on-4-off schedule repeats every eight days: four workdays, then four days off. Because the cycle is eight days long, your first workday moves one weekday later each cycle.
4 on, 4 off is ready to pick. Choose your first day and the calendar fills in.
Calendar tools
Downloads add your shifts and vacation days as all-day events, starting with the month shown. Days off aren’t included. A download is a one-time copy, so download again after you change your rotation.
Days you change by hand can be cleared here to return them to the rotation. Start over resets the rotation too.
Add to Home Screen
In Chrome or Edge, look for the install icon in the address bar or the install option in the browser menu. You can also bookmark this page.
Browse schedules
4 on, 4 off at a glance
- 8 days per cycle
- 4 workdays
- 4 days off
- 3.5 workdays per week on average
- 1Day
- 2Day
- 3Day
- 4Day
- 5Off
- 6Off
- 7Off
- 8Off
How to set up this schedule
Start on Monday to work Monday through Thursday, take Friday through Monday off, and start the next block on Tuesday.
Questions
- How many days a year do I work on 4 on 4 off?
- Half of all days. Over a 365-day year that is about 182 or 183 shifts, depending on where the cycle starts.
- How many hours is 4 on 4 off with 12-hour shifts?
- 48 hours per 8-day cycle, which averages 42 hours a week.
- Why do my days off move?
- The cycle is eight days, one longer than a week, so each block starts one weekday later than the one before it.